Eighty Two Track

Victorian High Country, Victoria

Length
2.4 km
Typical time
0.2 hours

A technical High Country connector featuring loose rock surfaces and challenging off-camber sections. Eighty Two Track rewards skilled drivers with pristine alpine meadows and distant views across the Victorian Alps.

Snow closure from June to October - check Parks Victoria for current conditions.

On the track

  • Low range required

Terrain

rocky, alpine, steep_climbs, technical

Navigation, live track alerts and trip recording are in the app.

Record this one and it goes straight into your garage alongside the rig you drove it in.

Get the app

Conditions change. Check current closures with the managing authority before you travel.